Trails
The Coalition is currently asking the state legislature for $100 million for the Washington Wildlife and Recreation Program (WWRP) in the capital construction budget.
WWRP Trails grants fund the acquisition and
development of cycling, pedestrian, equestrian and cross-country ski trails.
Projects may include trailheads, parking, restrooms, and picnic
areas.
Since 1990, the Coalition has secured $54 million
for state grants to protect 109 Trail projects in Washington State,
leveraging $65 million in local matching funds.
Below are lists and a map of proposed and funded WWRP projects.
This project will realign part the Centennial Trail to pass...
This project will develop a shared-use, 2.7-mile segment of the...
This project will pave the final 5,300’ segment of the...
The City of Spokane seeks WWRP funding to renovate and...
The project will build approximately 1 mile of 12-foot wide...
The scope of the project is to design and construct...
The goal of the Final Phase Project is to acquire...
The scope of this project is construction of nearly one-half...
The Olympic Dsicovery Trail will eventually extend from the City...
The U.S. Army Spruce Production Division constructed 36 miles of...
The goal of this project is to pave 1.5 miles...
-
Bear Creek Park Trail Development
-
This project is the development of approximately 2325 linear feet...
- 47.67 -122.11
-
Bear Creek Trail: The Missing Link
-
The project is the acquisition of a .81 acre parcel...
- 47.68 -122.11
-
Blyth Park Trail Connection
-
Acquisition and development of a parcel of land adjacent to...
- 47.75 -122.21
-
Bremerton Boardwalk Trail
-
The Bremerton Boardwalk Trail Project consists of a 3,200-foot overwater...
- 47.57 -122.63
-
Buckley Foothills Trail Extension
-
The City of Buckley plans to complete development of the...
- 47.17 -122.02
-
Burnt Bridge Creek Trail
-
This project involves the development of key sections of an...
- 45.66 -122.66
-
Cedar River Trail
-
Project consists of acquisition of 20 miles of railroad right-of-way...
- 47.38 -121.97
-
Cedar River Trail & Pedestrian Bridge
-
Project involves the development of 2.8 miles of trail from...
- 47.48 -122.2
-
Centennial Trail
-
Acquisition of 44 miles of abandoned railway from the Snohomish/Skagit...
- 48.1 -122.13
-
Centennial Trail (Spokane)
-
Implement phase 3 of this cooperative project including a river...
- 47.68 -117.36
-
Centennial Trail Development
-
Development of 10.5 miles of the Snohomish County Centennial Trail...
- 48.1 -122.13
-
Centennial Trail Development Phase 2
-
Snohomish County Centennial Trail Development: Phase 2 represents the construction...
- 48.1 -122.13
-
Centennial Trail Hwy. 9
-
Acquisition of an 18 mile abandoned railroad right-of-way and bridges...
- 48.41 -122.25
-
Centennial Trail Port Angeles
-
Acquisition of approsimately 10 acres of upland and 1.6 acres...
- 48.12 -123.36
-
Centennial Trail W. Link Bridge & Trail
-
The project addresses a phased improvement of the Spokane River...
- 47.66 -117.45
-
Chehalis Western Railroad R/W
-
Acquisition of abandoned railroad line from Martin Way in Lacey...
- 47.01 -122.85
-
Chehalis Western Trail
-
This proposal develops a 4.5 mile-trail from Pacific Avenue in...
- 47.01 -122.85
-
Chehalis Western Trail 'Missing Link'
-
This project will acquire 7.0 miles of abandoned Chehalis Western...
- 47.01 -122.85
-
Chehalis Western Trail Phase 2
-
This project will develop seven miles of trail corridor, including...
- 47.01 -122.85
-
Clear Creek Trail
-
The Clear Creek Trail is the first major public trail...
- 47.66 -122.68
-
Columbia Point Riverfront Trailway
-
This project will provide the final link of Riverfront Trailways...
- 46.27 -119.27
-
Columbia River Trail
-
Construction of approximately four miles of paved bike/pedestrian trail along...
- 47.44 -120.31
-
Cross-State Trail (Westside)
-
Acquisition of abandoned railroad line from Chehalis to South bend,...
- 47.0 -123.5
-
Cypress Island Interp. Trails
-
Design and construction of a non-motorized trail network within Cypress...
- 48.59 -122.7
-
Downtown Pullman Riverwalk
-
This project involves the land acquisition for and the construction...
- 46.73 -117.18
-
Dungeness Bridge Acquisition
-
Acquisition of the Dungenes Bridge property. Costs include appraisal and...
- 48.08 -123.15
-
Duwamish/Green River Trail
-
This phase is for a trail in Tukwila that will...
- 47.49 -122.27
-
Elwha River Ped. Bridge/ODT Link
-
The Elwha River Pedestrian Bridge - Olympic Discovery Trail (ODT)...
- 48.11 -123.55
-
English Boom Waterfront Trail
-
Project consists of the purchase of 6.87 acres of upland...
- 48.26 -122.44
-
Enumclaw Trail Development - Phase 1
-
The development of the Enumclaw Trail Project is the beginning...
- 47.19 -122.0
-
Evans Creek Trail
-
The Evans Creek Trail project is Phase I of the...
- 47.68 -122.09
-
Fish Lake Trail
-
Acquisition of about 15 miles of Burlington/Northern Railroad right-of-way to...
- 47.59 -117.45
-
Foothills Trail
-
Acquisition of 20-25 miles of abandoned Burlington Northern Railroad right-of-way...
- 47.09 -122.16
-
Foothills Trail - Cascade Junction Sec.
-
To acquire lands for development of proposed Foothills Linear Park...
- 47.09 -122.16
-
Foothills Trail - Orting to S. Prairie
-
To construct a 6.1 mile trail along an abandoned Burlington-Northern...
- 47.09 -122.16
-
Frenchman's Bar Trail
-
Acquisition and development of a 2.58 mile, multipurpose trail system...
- 45.69 -122.77
-
Green River Trail Dev., Ph. 1
-
Construciton of five miles of 12' paved trail surface from...
- 47.5 -122.3
-
Green River/Cedar River Trail
-
Acquisition of approsimately 4.5 miles of trail right-of-way from Lake...
- 47.32 -122.04
-
Greenway Pathway South
-
Extends the existing 4.6 mile Yakima Greenway Trail an additional...
- 46.57 -120.46
-
Hansville Greenway Phase 2
-
This project will acquire 225 acres of land, providing for...
- 47.9 -122.56
-
Hansville Greenway Trail
-
This acquisition is a key link in a greenway/trails system...
- 47.91 -122.56
-
Hood Canal Wetlands Trail
-
Construction of interpretive trails, boardwalks, and viewing platforms to provide...
- 47.44 -122.84
-
Horseshoe Bend Trail
-
Acquisition of approximately three-fourths of a mile of trail corridor...
- 47.37 -122.24
-
Interurban Trail - North Central Segment
-
The Interurban Trail is a multi-jurisdictional recreational trail of statewide...
- 47.76 -122.35
-
Interurban Trail - South Central Segment
-
The Interurban Trail is a multi-jurisdictional recreational trail of state...
- 47.75 -122.35
-
Interurban Trail 92
-
Development of a multiple-use trail from South Lynnwood Neighborhood Park...
- 47.81 -122.29
-
Interurban Trail 93
-
This project is for the development of a 1.5 miles...
- 47.81 -122.32
-
Interurban Trail Trailhead
-
This project is to acquire 1.8 acres for a trailhead...
- 47.26 -122.3
-
Iron Horse - Cle Elum to Ellensburg
-
Project includes improving the trail surface from South Cle Elum...
- 47.06 -120.69
-
Iron Horse - Lake Easton Trestle
-
In 1973, the State Parks and Recreation Commission adopted a...
- 47.25 -121.2
-
Iron Horse Trail Development
-
This project request is to complete railroad trestle restoration and...
- 47.44 -121.71
-
Iron Horse, Cedar Falls to Cabin Creek
-
This proposal will improve and increase public access to this...
- 47.44 -121.71
-
Iron Horse/ John Wayne - Snow Sheds
-
Iron Horse - Tunnel Nos. 49 and 50 and snowshed....
- 47.23 -121.17
-
Iron Horse/ John Wayne - Three Trestles
-
This project provides matching funds for a federal grant to...
- 47.44 -121.71
-
Issaquah-High Pt Regional Trai Connector
-
The scope of this project, Issaquah - High Point Regional...
- 47.53 -122.03
-
Lacamas Heritage Trail
-
This project involves the acquisition and development of a 2...
- 45.6 -122.41
-
Lacey Burlington Northern Trail Land Acq
-
This project is to purchase a small piece of land...
- 47.04 -122.84
-
Larry Scott Memorial Park 96
-
Larry Scott Memorial Park is a 7 mile trail corridor...
- 48.11 -122.78
-
Larry Scott Memorial Park 97
-
Larry Scott Memorial Park is a 7 mile trail corridor...
- 48.11 -122.78
-
Larry Scott Trail Dev. Segments 3 & 4
-
This project will construct 3.4 miles of non-motorized multi-use trail...
- 48.1 -122.82
-
Lewis River Tr. (Bells Mountain Trail)
-
Acquisition and development of a 12 miles, multipurpose trail system...
- 45.83 -122.4
-
Lewis River Trail
-
This project involves the acquisition of a 1.7 mile (77...
- 45.83 -122.4
-
May Creek Trail Addition
-
Acquisition of property to link the May Creek/Honey Creek greenbelt...
- 47.52 -122.16
-
Methow Valley Community Trail, Phase 3
-
This application is the third phase in a project that...
- 48.59 -120.41
-
Methow Valley Trail System
-
Acquisition of permanent easements and fee simple ownerships and development...
- 48.59 -120.41
-
Milton Interurban Trail
-
With this project, the City of Milton will acquire 19.88...
- 47.26 -122.32
-
Missing Link Underpass
-
Development of a trail underpass to provide safe off-street crossing...
- 47.76 -122.25
-
Mount Si Interpretative Trail
-
This proposal is to construct a trailhead (35 vehicle capacity),...
- 47.5 -121.7
-
Mt. Tahoma Ski Trail System
-
Construction of rest facilities and snow huts. These facilities near...
- 46.51 -121.98
-
ODT Railroad Bridge Trailhead Parking
-
This project will provide key parking and access to the...
- 48.09 -123.15
-
ODT: Jamestown S'Klallam Tribal Segment
-
The Jamestown S'Klallam Tribe proposes to construct a one-quarter mile...
- 48.02 -123.0
-
Olympia Woodland Trail Phase I Developme
-
Olympia Woodland Trail (OWT) Phase I Development will create a...
- 47.03 -122.89
-
Olympic Discovery Trail (Sequim)
-
Clallam County has established the Olympic Discovery Trail as the...
- 48.06 -123.05
-
Olympic Discovery Trail - 1991
-
Acquisition of abandoned railroad right-of-way from Port Townsend city limits...
- 48.11 -122.78
-
Olympic Discovery Trail - 1992
-
Acquisition of approsimately six miles of abandoned railroad right-of-way for...
- 48.1 -122.8
-
Palouse Path
-
This trail development offers a unique opportunity to link two...
- 46.71 -117.11
-
Railroad Trail/Alabama St. Overpass
-
This project will install an ADA accessible trail overpass for...
- 48.76 -122.43
-
Riverfront Park Trail Development
-
The City of Castle Rock and the School District intend...
- 46.27 -122.9
-
Riverfront Trail 2
-
The City of Castle Rock and the School District intend...
- 46.27 -122.9
-
Salmon Creek Trail
-
Within Clark County's 700 acre Salmon Creek Greenway, located three...
- 45.71 -122.66
-
Ship Canal Trail & Park
-
Acquisition of 500 feet of waterfront property located along the...
- 47.66 -122.37
-
Shoreline Interurban Trail Crossing
-
The City is currently designing the first segment of the...
- 47.74 -122.35
-
Similkameen Connector Trail Phase I
-
The Similkameen Connector Trail Phase 1 is the first step...
- 48.95 -119.46
-
Snohomish Riverfront Trail
-
Design, permits, and development of an asphalt non-motorized trail with...
- 47.91 -122.1
-
Soos Creek Regional Trail Dev. Ph 4
-
This request is for the combination 4th development phase to...
- 47.47 -122.16
-
South Bay Trail
-
Development of a continuous four mile multi-use trail corridor along...
- 48.74 -122.5
-
South Bay Trail - Missing Link
-
This project will develop a critical shoreline trail segment, which...
- 48.73 -122.51
-
South Boulevard Park
-
Acquisition of .5 acre of waterfront to provide pedestrian trail...
- 48.73 -122.5
-
South Ship Canal Trail Acquisition, Ph 2
-
The South Ship Canal Trail, Phase 2, will continue west...
- 47.66 -122.37
-
Thompson Trail Development
-
This project will convert the former Burlington-Northern Railroad corridor, purchased...
- 48.48 -122.58
-
Three Friends Fishing Hole Development
-
The project is for the acquisition of 9.24 acres of...
- 47.42 -122.26
-
Tiger Mountain - High Point Trailhead
-
Construction of High Point Trailhead, renovation of ten miles of...
- 47.55 -121.96
-
Tiger Mountain Ph. 3
-
This development includes a trailhead, rest stop, five miles of...
- 47.5 -121.98
-
Tiger Mt. Trailhead Construction
-
This project will develop two trailhead facilities and 10 miles...
- 47.47 -121.94
-
Trolley Trail Acquisition
-
The Trolley Trail Acquisition is just over one linear mile...
- 47.62 -117.48
-
Walla Walla Trail
-
Acquisition of developed trailhead for Walla Walla's proposed 25 mile...
- 46.07 -118.33
-
Washougal River Trail - Camas Segment
-
This project will develop a shared-use regional trail located in...
- 45.59 -122.38
-
Waterfront Trail
-
This project in Clallam County acquires seven city lots adjacent...
- 48.09 -123.42
-
Wenatchee Foothills Trails, Phase 1
-
This request seeks to implement the Foothills Trails plan by...
- 47.46 -120.38
-
Whatcom Creek Trail, Ph. 1
-
Combination acquisition and trail development along Whatcom Creek between Whatcom...
- 48.75 -122.45
-
William O. Douglas Trail Connections
-
The William O. Douglas Trail is a 75-mi. trail that...
- 46.63 -120.52
-
Woodard Bay Access Trail
-
Development of the Woodward Bay Access Trail, located in Thurston...
- 47.13 -122.85
-
Woodard Bay Access Trail Ph. 2
-
Phase 2 will complete various aspects of trail development including:...
- 47.13 -122.85
-
Centennial Trail Realignment at Gateway Park
-
This project will realign part the Centennial Trail to pass...
- 47.7 -117.05
-
Chelatchie Prairie Rail-with-Trail (Phase 1)
-
This project will develop a shared-use, 2.7-mile segment of the...
- 45.81 -122.49
-
Des Moines Creek Trail- Waterfront Connection
-
This project will pave the final 5,300’ segment of the...
- 47.41 -122.32
-
Interurban Trail - 3rd Ave SW to Stewart Road
-
The project will build approximately 1 mile of 12-foot wide...
- 47.26 -122.26
-
Interurban Trail Edmonds
-
The scope of the project is to design and construct...
- 47.79 -122.33
-
Mount Vernon Riverfront Promenade Trail
-
The scope of this project is construction of nearly one-half...
- 48.42 -122.34
-
Olympic Discovery Trail - Dry Creek Bridge
-
The Olympic Dsicovery Trail will eventually extend from the City...
- 48.12 -123.52
-
Spruce Railroad Trail Tunnel Restoration Project
-
The U.S. Army Spruce Production Division constructed 36 miles of...
- 48.09 -123.81
-
Willapa Hills Trail - Chehalis to Adna
-
The goal of this project is to pave 1.5 miles...
- 46.64 -123.01
Note: Not all projects are shown.

