The Coalition is currently asking the state legislature for $100 million for the Washington Wildlife and Recreation Program (WWRP) in the capital construction budget.

WWRP Trails grants fund the acquisition and development of cycling, pedestrian, equestrian and cross-country ski trails. Projects may include trailheads, parking, restrooms, and picnic areas.

Since 1990, the Coalition has secured $54 million for state grants to protect 109 Trail projects in Washington State, leveraging $65 million in local matching funds.

Below are lists and a map of proposed and funded WWRP projects.

2009 Funded Projects
Centennial Trail Realignment at Gateway Park - Spokane County Parks & Rec - $197,974

This project will realign part the Centennial Trail to pass...

Chelatchie Prairie Rail-with-Trail (Phase 1) - Clark County Parks Dept - $623,565

This project will develop a shared-use, 2.7-mile segment of the...

Des Moines Creek Trail- Waterfront Connection - Des Moines Parks & Rec Dept - $579,083

This project will pave the final 5,300’ segment of the...

Historic Iron Bridge Renovation - City of Spokane - $530,000

The City of Spokane seeks WWRP funding to renovate and...

Interurban Trail - 3rd Ave SW to Stewart Road - City of Pacific - $267,878

The project will build approximately 1 mile of 12-foot wide...

Interurban Trail Edmonds - Edmonds Parks and Recreation - $577,000

The scope of the project is to design and construct...

Larry Scott Trail Final Phase Project - Jefferson Co Public Works - $590,830

The goal of the Final Phase Project is to acquire...

Mount Vernon Riverfront Promenade Trail - City of Mount Vernon - $193,000

The scope of this project is construction of nearly one-half...

Olympic Discovery Trail - Dry Creek Bridge - City of Port Angeles - $379,670

The Olympic Dsicovery Trail will eventually extend from the City...

Spruce Railroad Trail Tunnel Restoration Project - Clallam Co Public Works Dept - $999,000

The U.S. Army Spruce Production Division constructed 36 miles of...

Willapa Hills Trail - Chehalis to Adna - State Parks - $300,000

The goal of this project is to pave 1.5 miles...

1990 - 2008 Funded Projects
Bear Creek Park Trail Development - Redmond Parks & Rec Dept - $118,971
Bear Creek Trail: The Missing Link - City of Redmond - $181,525
Bear/Evans Creek Multiple Use Trail - Redmond Parks & Rec Dept - $115,989
Blyth Park Trail Connection - Bothell Parks & Recreation - $15,000
Bremerton Boardwalk Trail - City of Bremerton - City of Bremerton - $2,000,000
Buckley Foothills Trail Extension - City of Buckley - $123,442
Buckley to South Prairie Foothills Trail - Pierce County Parks & Rec - $750,000
Burnt Bridge Creek Trail - Vancouver Parks & Rec Dept - $1,219,664
Cedar River Trail - King Co Parks & Rec - $380,821
Cedar River Trail & Pedestrian Bridge - Renton Parks Department - $651,183
Centennial Trail - Snohomish County Parks Dept - $1,000,000
Centennial Trail (Spokane) - State Parks - $860,318
Centennial Trail Development - Snohomish County Parks Dept - $1,659,725
Centennial Trail Development Phase 2 - Snohomish County Parks Dept - $1,531,872
Centennial Trail Hwy. 9 - Skagit County Parks & Rec - $154,292
Centennial Trail Port Angeles - Port Angeles Parks & Rec Dept - $301,078
Centennial Trail W. Link Bridge & Trail - State Parks - $499,970
Chehalis Western Railroad R/W - Thurston County Parks & Rec - $800,000
Chehalis Western Trail - Thurston County Parks & Rec - $1,000,122
Chehalis Western Trail 'Missing Link' - Thurston County Parks & Rec - $267,891
Chehalis Western Trail Phase 2 - Thurston County Parks & Rec - $618,779
Clear Creek Trail - Kitsap County Parks and Rec - $133,223
Columbia Point Riverfront Trailway - Richland Parks & Rec - $156,163
Columbia River Trail - County of Douglas - $300,000
Cross-State Trail (Westside) - State Parks - $1,038,900
Cushman Trail - Pierce County Parks & Rec - $273,200
Cypress Island Interp. Trails - Dept of Natural Resources - $125,000
Downtown Pullman Riverwalk - City of Pullman - $340,000
Dungeness Bridge Acquisition - Dept of Fish & Wildlife - $42,598
Duwamish/Green River Trail - Tukwila Parks & Rec Dept - $226,161
Eastside Trail Acq - South Segment - King County - $2,000,000
Eastside Trail Acq. - North Segment - King County - $1,218,785
Elwha River Ped. Bridge/ODT Link - County of Clallam - Clallam Co Public Works Dept - $999,500
English Boom Waterfront Trail - Island County Parks & Rec - $49,037
Enumclaw Trail Development - Phase 1 - Enumclaw Parks & Rec Dept - $127,500
Evans Creek Trail - Redmond Parks & Rec Dept - $500,000
Fish Lake Trail - Spokane Parks & Rec Dept - $181,744
Foothills Trail - Pierce County Parks & Rec - $500,000
Foothills Trail - Cascade Junction Sec. - Pierce County Parks & Rec - $300,000
Foothills Trail - Orting to S. Prairie - Pierce County Parks & Rec - $281,492
Frenchman's Bar Trail - Clark County Parks Dept - $461,054
Green River Trail Dev., Ph. 1 - King Co Parks & Rec - $1,000,000
Green River/Cedar River Trail - King Co Parks & Rec - $376,075
Greenway Pathway South - Yakima County Parks & Rec - $108,552
Hansville Greenway Phase 2 - Kitsap County Parks and Rec - $582,099
Hansville Greenway Trail - Kitsap County Parks and Rec - $406,750
Heron Trail - Phase 1 Boardwalk - City of Moses Lake - $342,318
Hood Canal Wetlands Trail - Dept of Fish & Wildlife - $699,653
Horseshoe Bend Trail - King Co Parks & Rec - $75,734
Interurban Trail - North Central Segment - City of Shoreline - $1,215,000
Interurban Trail - South Central Segment - Shoreline Parks & Rec Dept - $303,607
Interurban Trail 92 - Lynnwood Parks & Rec - $483,185
Interurban Trail 93 - Mountlake Terrace Rec & Parks - $241,920
Interurban Trail Trailhead - City of Milton - $31,023
Iron Horse - Cle Elum to Ellensburg - State Parks - $697,347
Iron Horse - Lake Easton Trestle - State Parks - $695,000
Iron Horse Trail Development - State Parks - $60,656
Iron Horse, Cedar Falls to Cabin Creek - State Parks - $1,332,333
Iron Horse/ John Wayne - Snow Sheds - State Parks - $417,174
Iron Horse/ John Wayne - Three Trestles - State Parks - $370,039
Issaquah-High Pt Regional Trai Connector - City of Issaquah - Issaquah - $108,924
Lacamas Heritage Trail - Clark County Parks Dept - $546,825
Lacey Burlington Northern Trail Land Acq - City of Lacey - $399,724
Larry Scott Memorial Park 96 - Jefferson Co Public Works - $143,500
Larry Scott Memorial Park 97 - Jefferson Co Public Works - $171,840
Larry Scott Trail Dev. Segments 3 & 4 - Jefferson Co Public Works - $382,424
Lewis River Tr. (Bells Mountain Trail) - Clark County Parks Dept - $946,737
Lewis River Trail - Clark County Parks Dept - $838,235
May Creek Trail Addition - City of Newcastle - $267,915
Methow Valley Community Trail, Phase 3 - County of Okanogan - $196,000
Methow Valley Trail System - Okanogan County Parks & Rec - $239,000
Milton Interurban Trail - City of Milton - $328,779
Missing Link Underpass - King Co Parks & Rec - $300,000
Mount Si Interpretative Trail - Dept of Natural Resources - $140,000
Mt. Tahoma Ski Trail System - Dept of Natural Resources - $59,216
ODT Railroad Bridge Trailhead Parking - Jamestown S'Klallam Tribe - $97,128
ODT: Jamestown S'Klallam Tribal Segment - Jamestown S'Klallam Tribe - $131,033
Olympia Woodland Trail Phase I Developme - Olympia Parks, Arts & Rec - $300,000
Olympic Discovery Trail (Sequim) - City of Sequim - $291,170
Olympic Discovery Trail - 1991 - Jefferson Co Public Works - $100,000
Olympic Discovery Trail - 1992 - Jefferson Co Public Works - $200,000
Palouse Path - Pullman Parks & Recreation - $389,070
Railroad Trail/Alabama St. Overpass - Bellingham Parks & Rec Dept - $200,000
Riverfront Park Trail Development - City of Castle Rock - $81,221
Riverfront Trail 2 - City of Castle Rock - $401,147
Salmon Creek Trail - Clark County Parks Dept - $368,259
Ship Canal Trail & Park - Seattle Parks & Rec Dept - $319,500
Shoreline Interurban Trail Crossing - Shoreline Parks & Rec Dept - $1,581,773
Similkameen Connector Trail Phase I - Okanogan County Public Works - $688,666
Snohomish Riverfront Trail - City of Snohomish - $716,682
Soos Creek Regional Trail Dev. Ph 4 - King Co Parks & Rec - $885,082
South Bay Trail - Bellingham Parks & Rec Dept - $224,938
South Bay Trail - Missing Link - Bellingham Parks & Rec Dept - $800,000
South Boulevard Park - Bellingham Parks & Rec Dept - $150,000
South Ship Canal Trail Acquisition, Ph 2 - Dept of Seattle - Seattle Transportation - $265,490
Thompson Trail Development - Anacortes Parks & Rec Dept - $406,950
Three Friends Fishing Hole Development - Kent Parks, Rec & Comm Serv - $300,000
Tiger Mountain - High Point Trailhead - Dept of Natural Resources - $653,800
Tiger Mountain Ph. 3 - Dept of Natural Resources - $291,926
Tiger Mt. Trailhead Construction - Dept of Natural Resources - $725,385
Trolley Trail Acquisition - Spokane Parks & Rec Dept - $36,950
Walla Walla Trail - Walla Walla Parks & Rec - $100,675
Washougal River Trail - Camas Segment - City of Camas - City of Camas - $898,784
Waterfront Trail - Port Angeles Parks & Rec Dept - $272,000
Wenatchee Foothills Trails, Phase 1 - City of Wenatchee - City of Wenatchee - $172,043
Whatcom Creek Trail, Ph. 1 - Bellingham Parks & Rec Dept - $1,391,059
Whatcom Creek Trail, Ph. 2 - Bellingham Parks & Rec Dept - $71,785
William O. Douglas Trail Connections - City of Yakima - $796,883
Woodard Bay Access Trail - Dept of Natural Resources - $698,649
Woodard Bay Access Trail Ph. 2 - Dept of Natural Resources - $669,079
Green Marker Bear Creek Park Trail Development
This project is the development of approximately 2325 linear feet...
47.67 -122.11
Green Marker Bear Creek Trail: The Missing Link
The project is the acquisition of a .81 acre parcel...
47.68 -122.11
Green Marker Blyth Park Trail Connection
Acquisition and development of a parcel of land adjacent to...
47.75 -122.21
Green Marker Bremerton Boardwalk Trail
The Bremerton Boardwalk Trail Project consists of a 3,200-foot overwater...
47.57 -122.63
Green Marker Buckley Foothills Trail Extension
The City of Buckley plans to complete development of the...
47.17 -122.02
Green Marker Burnt Bridge Creek Trail
This project involves the development of key sections of an...
45.66 -122.66
Green Marker Cedar River Trail
Project consists of acquisition of 20 miles of railroad right-of-way...
47.38 -121.97
Green Marker Cedar River Trail & Pedestrian Bridge
Project involves the development of 2.8 miles of trail from...
47.48 -122.2
Green Marker Centennial Trail
Acquisition of 44 miles of abandoned railway from the Snohomish/Skagit...
48.1 -122.13
Green Marker Centennial Trail (Spokane)
Implement phase 3 of this cooperative project including a river...
47.68 -117.36
Green Marker Centennial Trail Development
Development of 10.5 miles of the Snohomish County Centennial Trail...
48.1 -122.13
Green Marker Centennial Trail Development Phase 2
Snohomish County Centennial Trail Development: Phase 2 represents the construction...
48.1 -122.13
Green Marker Centennial Trail Hwy. 9
Acquisition of an 18 mile abandoned railroad right-of-way and bridges...
48.41 -122.25
Green Marker Centennial Trail Port Angeles
Acquisition of approsimately 10 acres of upland and 1.6 acres...
48.12 -123.36
Green Marker Centennial Trail W. Link Bridge & Trail
The project addresses a phased improvement of the Spokane River...
47.66 -117.45
Green Marker Chehalis Western Railroad R/W
Acquisition of abandoned railroad line from Martin Way in Lacey...
47.01 -122.85
Green Marker Chehalis Western Trail
This proposal develops a 4.5 mile-trail from Pacific Avenue in...
47.01 -122.85
Green Marker Chehalis Western Trail 'Missing Link'
This project will acquire 7.0 miles of abandoned Chehalis Western...
47.01 -122.85
Green Marker Chehalis Western Trail Phase 2
This project will develop seven miles of trail corridor, including...
47.01 -122.85
Green Marker Clear Creek Trail
The Clear Creek Trail is the first major public trail...
47.66 -122.68
Green Marker Columbia Point Riverfront Trailway
This project will provide the final link of Riverfront Trailways...
46.27 -119.27
Green Marker Columbia River Trail
Construction of approximately four miles of paved bike/pedestrian trail along...
47.44 -120.31
Green Marker Cross-State Trail (Westside)
Acquisition of abandoned railroad line from Chehalis to South bend,...
47.0 -123.5
Green Marker Cypress Island Interp. Trails
Design and construction of a non-motorized trail network within Cypress...
48.59 -122.7
Green Marker Downtown Pullman Riverwalk
This project involves the land acquisition for and the construction...
46.73 -117.18
Green Marker Dungeness Bridge Acquisition
Acquisition of the Dungenes Bridge property. Costs include appraisal and...
48.08 -123.15
Green Marker Duwamish/Green River Trail
This phase is for a trail in Tukwila that will...
47.49 -122.27
Green Marker Elwha River Ped. Bridge/ODT Link
The Elwha River Pedestrian Bridge - Olympic Discovery Trail (ODT)...
48.11 -123.55
Green Marker English Boom Waterfront Trail
Project consists of the purchase of 6.87 acres of upland...
48.26 -122.44
Green Marker Enumclaw Trail Development - Phase 1
The development of the Enumclaw Trail Project is the beginning...
47.19 -122.0
Green Marker Evans Creek Trail
The Evans Creek Trail project is Phase I of the...
47.68 -122.09
Green Marker Fish Lake Trail
Acquisition of about 15 miles of Burlington/Northern Railroad right-of-way to...
47.59 -117.45
Green Marker Foothills Trail
Acquisition of 20-25 miles of abandoned Burlington Northern Railroad right-of-way...
47.09 -122.16
Green Marker Foothills Trail - Cascade Junction Sec.
To acquire lands for development of proposed Foothills Linear Park...
47.09 -122.16
Green Marker Foothills Trail - Orting to S. Prairie
To construct a 6.1 mile trail along an abandoned Burlington-Northern...
47.09 -122.16
Green Marker Frenchman's Bar Trail
Acquisition and development of a 2.58 mile, multipurpose trail system...
45.69 -122.77
Green Marker Green River Trail Dev., Ph. 1
Construciton of five miles of 12' paved trail surface from...
47.5 -122.3
Green Marker Green River/Cedar River Trail
Acquisition of approsimately 4.5 miles of trail right-of-way from Lake...
47.32 -122.04
Green Marker Greenway Pathway South
Extends the existing 4.6 mile Yakima Greenway Trail an additional...
46.57 -120.46
Green Marker Hansville Greenway Phase 2
This project will acquire 225 acres of land, providing for...
47.9 -122.56
Green Marker Hansville Greenway Trail
This acquisition is a key link in a greenway/trails system...
47.91 -122.56
Green Marker Hood Canal Wetlands Trail
Construction of interpretive trails, boardwalks, and viewing platforms to provide...
47.44 -122.84
Green Marker Horseshoe Bend Trail
Acquisition of approximately three-fourths of a mile of trail corridor...
47.37 -122.24
Green Marker Interurban Trail - North Central Segment
The Interurban Trail is a multi-jurisdictional recreational trail of statewide...
47.76 -122.35
Green Marker Interurban Trail - South Central Segment
The Interurban Trail is a multi-jurisdictional recreational trail of state...
47.75 -122.35
Green Marker Interurban Trail 92
Development of a multiple-use trail from South Lynnwood Neighborhood Park...
47.81 -122.29
Green Marker Interurban Trail 93
This project is for the development of a 1.5 miles...
47.81 -122.32
Green Marker Interurban Trail Trailhead
This project is to acquire 1.8 acres for a trailhead...
47.26 -122.3
Green Marker Iron Horse - Cle Elum to Ellensburg
Project includes improving the trail surface from South Cle Elum...
47.06 -120.69
Green Marker Iron Horse - Lake Easton Trestle
In 1973, the State Parks and Recreation Commission adopted a...
47.25 -121.2
Green Marker Iron Horse Trail Development
This project request is to complete railroad trestle restoration and...
47.44 -121.71
Green Marker Iron Horse, Cedar Falls to Cabin Creek
This proposal will improve and increase public access to this...
47.44 -121.71
Green Marker Iron Horse/ John Wayne - Snow Sheds
Iron Horse - Tunnel Nos. 49 and 50 and snowshed....
47.23 -121.17
Green Marker Iron Horse/ John Wayne - Three Trestles
This project provides matching funds for a federal grant to...
47.44 -121.71
Green Marker Issaquah-High Pt Regional Trai Connector
The scope of this project, Issaquah - High Point Regional...
47.53 -122.03
Green Marker Lacamas Heritage Trail
This project involves the acquisition and development of a 2...
45.6 -122.41
Green Marker Lacey Burlington Northern Trail Land Acq
This project is to purchase a small piece of land...
47.04 -122.84
Green Marker Larry Scott Memorial Park 96
Larry Scott Memorial Park is a 7 mile trail corridor...
48.11 -122.78
Green Marker Larry Scott Memorial Park 97
Larry Scott Memorial Park is a 7 mile trail corridor...
48.11 -122.78
Green Marker Larry Scott Trail Dev. Segments 3 & 4
This project will construct 3.4 miles of non-motorized multi-use trail...
48.1 -122.82
Green Marker Lewis River Tr. (Bells Mountain Trail)
Acquisition and development of a 12 miles, multipurpose trail system...
45.83 -122.4
Green Marker Lewis River Trail
This project involves the acquisition of a 1.7 mile (77...
45.83 -122.4
Green Marker May Creek Trail Addition
Acquisition of property to link the May Creek/Honey Creek greenbelt...
47.52 -122.16
Green Marker Methow Valley Community Trail, Phase 3
This application is the third phase in a project that...
48.59 -120.41
Green Marker Methow Valley Trail System
Acquisition of permanent easements and fee simple ownerships and development...
48.59 -120.41
Green Marker Milton Interurban Trail
With this project, the City of Milton will acquire 19.88...
47.26 -122.32
Green Marker Missing Link Underpass
Development of a trail underpass to provide safe off-street crossing...
47.76 -122.25
Green Marker Mount Si Interpretative Trail
This proposal is to construct a trailhead (35 vehicle capacity),...
47.5 -121.7
Green Marker Mt. Tahoma Ski Trail System
Construction of rest facilities and snow huts. These facilities near...
46.51 -121.98
Green Marker ODT Railroad Bridge Trailhead Parking
This project will provide key parking and access to the...
48.09 -123.15
Green Marker ODT: Jamestown S'Klallam Tribal Segment
The Jamestown S'Klallam Tribe proposes to construct a one-quarter mile...
48.02 -123.0
Green Marker Olympia Woodland Trail Phase I Developme
Olympia Woodland Trail (OWT) Phase I Development will create a...
47.03 -122.89
Green Marker Olympic Discovery Trail (Sequim)
Clallam County has established the Olympic Discovery Trail as the...
48.06 -123.05
Green Marker Olympic Discovery Trail - 1991
Acquisition of abandoned railroad right-of-way from Port Townsend city limits...
48.11 -122.78
Green Marker Olympic Discovery Trail - 1992
Acquisition of approsimately six miles of abandoned railroad right-of-way for...
48.1 -122.8
Green Marker Palouse Path
This trail development offers a unique opportunity to link two...
46.71 -117.11
Green Marker Railroad Trail/Alabama St. Overpass
This project will install an ADA accessible trail overpass for...
48.76 -122.43
Green Marker Riverfront Park Trail Development
The City of Castle Rock and the School District intend...
46.27 -122.9
Green Marker Riverfront Trail 2
The City of Castle Rock and the School District intend...
46.27 -122.9
Green Marker Salmon Creek Trail
Within Clark County's 700 acre Salmon Creek Greenway, located three...
45.71 -122.66
Green Marker Ship Canal Trail & Park
Acquisition of 500 feet of waterfront property located along the...
47.66 -122.37
Green Marker Shoreline Interurban Trail Crossing
The City is currently designing the first segment of the...
47.74 -122.35
Green Marker Similkameen Connector Trail Phase I
The Similkameen Connector Trail Phase 1 is the first step...
48.95 -119.46
Green Marker Snohomish Riverfront Trail
Design, permits, and development of an asphalt non-motorized trail with...
47.91 -122.1
Green Marker Soos Creek Regional Trail Dev. Ph 4
This request is for the combination 4th development phase to...
47.47 -122.16
Green Marker South Bay Trail
Development of a continuous four mile multi-use trail corridor along...
48.74 -122.5
Green Marker South Bay Trail - Missing Link
This project will develop a critical shoreline trail segment, which...
48.73 -122.51
Green Marker South Boulevard Park
Acquisition of .5 acre of waterfront to provide pedestrian trail...
48.73 -122.5
Green Marker South Ship Canal Trail Acquisition, Ph 2
The South Ship Canal Trail, Phase 2, will continue west...
47.66 -122.37
Green Marker Thompson Trail Development
This project will convert the former Burlington-Northern Railroad corridor, purchased...
48.48 -122.58
Green Marker Three Friends Fishing Hole Development
The project is for the acquisition of 9.24 acres of...
47.42 -122.26
Green Marker Tiger Mountain - High Point Trailhead
Construction of High Point Trailhead, renovation of ten miles of...
47.55 -121.96
Green Marker Tiger Mountain Ph. 3
This development includes a trailhead, rest stop, five miles of...
47.5 -121.98
Green Marker Tiger Mt. Trailhead Construction
This project will develop two trailhead facilities and 10 miles...
47.47 -121.94
Green Marker Trolley Trail Acquisition
The Trolley Trail Acquisition is just over one linear mile...
47.62 -117.48
Green Marker Walla Walla Trail
Acquisition of developed trailhead for Walla Walla's proposed 25 mile...
46.07 -118.33
Green Marker Washougal River Trail - Camas Segment
This project will develop a shared-use regional trail located in...
45.59 -122.38
Green Marker Waterfront Trail
This project in Clallam County acquires seven city lots adjacent...
48.09 -123.42
Green Marker Wenatchee Foothills Trails, Phase 1
This request seeks to implement the Foothills Trails plan by...
47.46 -120.38
Green Marker Whatcom Creek Trail, Ph. 1
Combination acquisition and trail development along Whatcom Creek between Whatcom...
48.75 -122.45
Green Marker William O. Douglas Trail Connections
The William O. Douglas Trail is a 75-mi. trail that...
46.63 -120.52
Green Marker Woodard Bay Access Trail
Development of the Woodward Bay Access Trail, located in Thurston...
47.13 -122.85
Green Marker Woodard Bay Access Trail Ph. 2
Phase 2 will complete various aspects of trail development including:...
47.13 -122.85
Red Marker Centennial Trail Realignment at Gateway Park
This project will realign part the Centennial Trail to pass...
47.7 -117.05
Red Marker Chelatchie Prairie Rail-with-Trail (Phase 1)
This project will develop a shared-use, 2.7-mile segment of the...
45.81 -122.49
Red Marker Des Moines Creek Trail- Waterfront Connection
This project will pave the final 5,300’ segment of the...
47.41 -122.32
Red Marker Interurban Trail - 3rd Ave SW to Stewart Road
The project will build approximately 1 mile of 12-foot wide...
47.26 -122.26
Red Marker Interurban Trail Edmonds
The scope of the project is to design and construct...
47.79 -122.33
Red Marker Mount Vernon Riverfront Promenade Trail
The scope of this project is construction of nearly one-half...
48.42 -122.34
Red Marker Olympic Discovery Trail - Dry Creek Bridge
The Olympic Dsicovery Trail will eventually extend from the City...
48.12 -123.52
Red Marker Spruce Railroad Trail Tunnel Restoration Project
The U.S. Army Spruce Production Division constructed 36 miles of...
48.09 -123.81
Red Marker Willapa Hills Trail - Chehalis to Adna
The goal of this project is to pave 1.5 miles...
46.64 -123.01

Note: Not all projects are shown.

Document Actions

My Backyard
What's happening in your community? Choose one of the features below.
Search by City:
Search by County:
Search by Legislative District:
Find Us On
FaceBook v2 Twitter v2
Updates by Email
Enter your email address to receive our e-newsletter
Privacy Policy